BAKO DRAINAGE SCHEME
Location    The project covers an area of 240 hectares and between latitude 1 degree 38 minute N and 1 degree 40 minute N, longitude 110 degree 24 minute E in the Kuching Division of Sarawak on the left bank of Sg. Bako. The project  area stretches westwards to as far as Sg. Tabo.
Objectives To overcome the constrains which hinder agricultural development in the  area :-
(a) Salt water inundation of the project area during high tide.
(b) Fresh water flooding of the project area during rainy seasons.
(c) Improve the living standard of the farmers.
Construction Period 1976 - 1977
Project Cost Project cost is RM370,000.00
Date Of Completion completed in the year 1977.
Project Area Total Project Area is 240 Ha.
Project Component The main components of the project works consist of the following :
- 6.0 Km of Perimeter Bunds and Drains
- 13.5 Km of Internal Bunds and Drains
- 2 no. 4 ft x 4 ft Tidal Control Gates
- 13 nos Belian Bridges
- Site Camp
Crop Coconuts / Fruit Trees e.g. rambutan / durian
Population People from Kampung Bako.
DAMAI IADP SCHEME
Location    The project covers an area of 1487 hectares and bounded by Sg. Santubong on the West and Sg. Buntal on the East and South and is located in the Kuching Division, Sarawak.
Objectives To drain the area which is mostly under mangrove forest to enable the farmers to develop the area and would also contribute to an increase in the farming activities thus increasing the  income of the farmers.
Construction Period 1984 - 1994
Project Cost Project cost is RM 7,700,000.00
Date Of Completion completed in the year 1994
Project Area Total Project Area is 1487 Ha.
Project Component The main components of the project works consist of the following :
- 18.3 Km of Perimeter Bunds and Drains
- 30.0 Km of Internal Bunds and Drains
- 9 nos of Tidal Control Gates
- 44 nos of culverts
- 2 nos Belian Bridges
- 2 nos Check Gates
- Site Camp
Crop  Coconut & Fruit Trees
Population 1. Kpg. Buntal
2. Kpg. Sungai Lumut
KAMPUNG BENGGANG DRAINAGE SCHEME
Location    It is located on the left bank of Batang Kayan about 6 Km downstream of Lundu Bazaar in Lundu District. Access is by boat only taking about 15 minute from Lundu Bazaar.
Objectives The main objective is to improve soil condition  thus increase production from tree crops of the project and to raise the income and living standard of the local farmers.
(a) Provide drainage to the project area.
(b) To prevent salt water inun dation of the area.
(c) To provide easy access within the project area.
Construction Period 1992 - 1993
Project Cost Project cost is RM 813,000.00
Date Of Completion Completed in the year 1993.
Project Area Total Project Area is 280 Ha.
Project Component The main components of the project works consist of the following :
- 9.10 Km of Perimeter Bunds and Drains
- 2.2 Km of Cutoff Drain
- 5.54 Km of Internal Bunds and Drains
- 2 nos Tidal Control Gates
- 10 nos Belian Bridges
- 4 nos of Belian Jetties
- 2 nos Culverts
- Site Camp
Crop Paddy, coconuts & cash crops.
Population People from Kampung Benggang.
KAMPUNG PUEH IRRIGATION SCHEME
Location    The project area covers an area of 65 hectares and is located in Sematan Sub-District, bounded by the South China Sea on the north and by the Gunung Pueh range on the South in Lundu District.
Objectives The main objective here is to improve irrigation to increase yield of padi planted as double cropping in the project area.
(a)    Provide water storage for better irrigation.
(b)    Provide direct irrigation to individual padi plot by internal irrigation dithes.
(c)    To provide facilities for double cropping of padi.
(d)    To ease transport by providing farm road.
Construction Period 1993-1994
Project Cost Project cost is RM 703,000.00
Date Of Completion Completed in the year 1994.
Project Area Total Project Area is 65 Ha.
Project Component The main components of the project works consist of the following :
- 2.23 Km of Perimeter Bunds
- 2.23 Km of Cutoff Drain
- 3.78 Km of Internal Drains
- 1 no Storage Pond
- 9.74 Km of Irrigation Canals.
- 1 no Spillway
- 15 nos Culverts
- Site Camp
Crop Double cropping of paddy.
Population People from Kampung Pueh.
KAMPUNG STUNGGANG DRAINAGE SCHEME
Location    The project is situated next to Sebandi 'A' Scheme covers an area of 41.7 hectares and lies between latitude 1 degree 36 minute N and 1 degree 37 minute N, longitude 109 degree 51 minute E in the Kuching Division of Sarawak. The project area is situated on the upper stream of Batang Kayan on its right bank.
Objectives (a)    Contruction of perimeter bund & drain to prevent high tide.
(b)    Fresh water flooding of the project area for one crop of padi.
(c)    To provide better farming land for the farmers.
(d)    To enable farmers to plant cash crops during off seasons.
(e)    To provide better drainage system to the project area.
(f)    The scheme area is accessibility by rivermine transport with only 1 Km away from Lundu Bazaar. For the land transport is posibble with the construction of perimeter bund for the Proposed Kpg. Stunggang Scheme which eventually will join to the existing Kpg. Stunggangaccess road leading to Bau / Lundu Road near the Lundu FerryRam.
Construction Period 1997
Project Cost Project cost is RM 213,000.00
Date Of Completion Completed in the year 1997.
Project Area Total Project Area is 42 Ha.
Project Component The main components of the project works consist of the following :
- 3.00 Km of Perimeter Bunds and Drains
- 1.74 Km of Cutoff Drains
- 0.46 Km of Internal Bunds and Drains
- 1 no. 1.22 m x 1.22 m Tidal Control Gates
- 2 nos Culverts
- 2 nos Drop Structures
Crop Single cropping paddy in the main season and cash crops in the off season.
Population Kampung Stunggang Dayak